Project cost and schedule control的意思|示意
项目成本及进度控制
Project cost and schedule control的网络常见释义
项目成本和进度控制 负责项目的进度控制 Responsible for schedule of projects 项目成本和进度控制 Project cost and schedule control 成本进度控制系统条件 C / SCSC Cost / Schedule Control System Criteria ..
Project cost and schedule control相关例句
Prepare project management for some project, control project schedule, control project cost and down project risk.
参与部分项目的项目管理工作,把控项目进度,控制项目成本,降低项目风险;
Quality initiatives must lead cost and schedule in the control of the project to satisfy the spirit of the CMM.
质量活动必须使成本和进度处于项目的控制之下,以满足CMM的精神。
Project earned value management is the most effective co-ordinate control methods of cost and schedule by far, but our research on the earned value management is still very limited.
项目挣值管理是迄今为止最有成效的一种进度与费用协调控制方法,然而我国对挣值管理的研究还很有限。
Responsible for project cost and schedule control.
负责项目成本和进度控制。
The case study indicates that the method proposed in this article can effectively plan and control project cost and schedule objectives.
实例研究表明,本文提出的方法可更好地计划和控制项目的费用及进度目标。
The new market situation brings forward a higher demand for the cost, schedule and control of the construction project.
在新的市场形势下,对工程项目建设的出成本、进度、控制提出了更高的要求。