Final Acceptance Testing的意思|示意
Final Acceptance Testing的网络常见释义
最终接受测试 软件本地化测试类型 d Acceptance Testing, BAT),软件常规测试(Normal Testing),软件最终接受测试(Final Acceptance Testing, FAT)。 软件版本接受测试又称为版本健全检测(Build Sanity Check, BSC),也称作冒烟
软件最终接受测试 软件本地化测试类型 d Acceptance Testing, BAT),软件常规测试(Normal Testing),软件最终接受测试(Final Acceptance Testing, FAT)。 软件版本接受测试又称为版本健全检测(Build Sanity Check, BSC),也称作冒烟
Final Acceptance Testing相关例句
Emerson was also responsible for final acceptance testing of all products and systems, control system configuration, training, and other on-site services.
艾默生还负责所有产品和系统,控制系统配置,培训及其它现场服务的最终验收测试。
Supervise commissioning of instrumentation and final loop acceptance testing.
监管仪表调试以及仪表控制回路最终测试验收。
Testing the new infrastructure, both one unit at a time and all systems together. This is followed by a final "acceptance test, " run by the customer.
验收测试(也被称为功能测试)是由客户指定来测试整个系统是否完成既定功能。
Final assembly began in early 2011 with acceptance testing expected to occur mid-year. Flight testing is scheduled to begin on AF-1 test aircraft late in 2012.
最后组装已于2011年初展开,预计在年中进行兼容性方面的测试,飞行试验计划于2012年底在AF - 1试验机上完成。