Control project progress的意思|示意

美 / / 英 / /

控制项目进度


Control project progress的网络常见释义

项目进度控制 中国是一个伟大的国家 » China is a great country 项目进度控制 » Control project progress 最大的优势 » The greatest advantage ..

Control project progress相关短语

1、 project progress control 项目进度控制

Control project progress相关例句

Cost control is an important component of cost management of the project, of which the most important implementation is to integrated control costs and the progress of the construction.

成本控制是项目成本管理的一个重要环节,在项目成本管理实施中最重要的控制要点就是对成本与进度的集成控制。

The key of low cost strategy for a petroleum engineering project is to effectively control the project progress, its cost and quality.

石油工程项目实施低成本战略,关键是对项目的进度、成本与质量进行有效地控制。

The Xiaolangdi water control project is constructed in smooth progress with its major items all along keeping in advance of the contractual schedule.

小浪底水利枢纽大坝工程施工进度进展顺利,各主要项目一直超前合同目标计划。

In the process of contracting, these risks will produce a great influence on the project progress, its cost and quality control.

在工程承包过程中,这些风险因素都可能给工程进度、费用、质量的控制造成极大影响。

ABSTRACT: This paper introduced the progress control process of initial energization in AP1000 Sanmen Project, and provided the analysis direct at schedule variance appeared.

摘要:介绍ap1000三门项目首次倒送电的整体进度控制过程,并针对现场执行过程中执行计划与基准计划的偏差进行分析。

Quality control should combine organically with the project cost and construction progress.

质量控制应与工程成本、施工进度有机结合。